AES McFarland DFR

AES McFarland DFR

Yuma, AZ

Project Overview


Contracted by

Ampirical Engineering

System

Digital Fault Recorder (DFR)

Equipment Monitored

24 Major Electrical Assets


Client

AES

Location

Yuma, AZ

Multi-Year Underground Directional Boring & Emergency Excavation Program

Outback Contractors was subcontracted by Ampirical Engineering to install a new NERC-required Digital Fault Recording (DFR) system at AES McFarland. The system provides real-time monitoring of electrical faults and current fluctuations across solar and battery energy storage facilities, supporting grid stabilization, event reporting, and rapid response to changes in generation capacity.

The project included installation of new relay racks, DFR monitoring equipment, field test switches, voltage/current modules, CT/PT shorting blocks, and associated wiring across multiple energized control rooms. Work was completed with limited outages and without disruption to ongoing facility operations.

AES McFarland DFR

Full Scope of Work

DFR Monitoring System
  • Installed DFR monitoring infrastructure for one 500kV breaker and one 500kV/34.5kV transformer
  • Integrated monitoring for five 34.5kV capacitor banks and seventeen 34.5kV breakers
  • Installed relay racks, DFR monitoring relays, field test switches, voltage/current modules, and CT/PT shorting blocks
Control Rooms A & B
  • Installed one new relay rack with two DFR monitoring relays
  • Installed seventeen field test switches and twenty voltage/current modules
  • Completed inter-panel wiring, cable installation, and CT connections to individual breaker relay control panels
Control Room C
  • Installed one new relay rack with one DFR monitoring relay
  • Installed six field test switches and nine voltage/current modules
  • Completed inter-panel wiring, cable installation, and CT connections to individual breaker relay control panels
Energized Work & Safety
  • Performed installation within an energized, operating generation facility with limited field outages
  • Used Outback-developed energized wiring procedures, protective barriers, testing protocols, insulated tooling, and pre/post-work documentation
  • Completed work without safety incidents or impacts to the client’s ongoing generation operations
Additional Electrical Work
  • Outback’s energized-work procedures were accepted by the client and adopted as a standard for work around energized relay and control systems
  • Following completion of the DFR scope, AES directly requested additional electrical work from Outback
  • Removed and replaced a failed 34.5kV outdoor current transformer (CT) for AES