Garberville Substation

Garberville Substation Emergency Slope Repair

Garberville, CA

Project Overview


Soil Nails Installed

490

Concrete Poured

450 CY

Excavators Used

Spider

Project Duration

12/2024-Current

Completed

2025


Client

Pacific Gas and Electric Company

Location

Garberville, CA

Emergency Substation Landslide Stabilization & Foundation Reconstruction

Emergency slope stabilization and foundation repair at a PGE substation following a critical landslide event. The project combined geotechnical soil nail installation, slope re-grading, and new TSP foundation construction to restore substation operability and long-term slope stability.

Garberville Substation
Garberville Substation

Full Scope of Work

Slope Stabilization
  • Installation of 490 soil nails for slope retention and stabilization
  • Slope re-grading and re-profiling to reduce future slide risk
  • Drainage improvements integrated into slope repair design
Foundation & Structural Work
  • Construction of new TSP foundation to replace slide-damaged structure
  • 450 CY of concrete poured for foundations and slope facing
  • Structural coordination with PGE substation design engineers
Specialized Equipment
  • All machine work performed using spider (remote-operated) excavators for access on steep slope
  • Spider excavators enabled safe operation on grades impractical for conventional equipment
  • Equipment selection and rigging reviewed by site safety and engineering team